Anglian Building Products - HomeCall or email us
Providing quality windows and doors to the B2B and public sector
Search

Vertical Integration

Vertical Integration
Vertical Integration

At Anglian, one of our main competitive advantages is that we operate a vertically integrated service, enabling total control of all processes from initial design, survey, manufacture, fabrication and glazing to final installation and after sales support.

Raw Material Supply

Anglian’s position as market leader provides us with enormous buying power. Our procurement department backed by advice from external consultants KPMG Government Advisory Body uses the latest innovative procurement techniques to ensure best value is achieved. All supply chain partners are engaged on formal Service Level Agreements with a strong focus on efficiency, performance management and collaborative working.

Extrusion

We blend the PVC-u raw materials in-house to give certainty of quality and consistency. We then extrude over 150 different extrusion sections in our dedicated extrusion facility. The range of profiles include main window and door frame sections, trims, fascia, soffit and gaskets. All are extruded to strict quality standards including BSI Kitemarks and British Board of Agrément Certificates.

Glass Processing

Our Glass Shop utilises computer optimised glass cutting tables to minimise waste, glass is then toughened as required using our huge furnaces ready for assembly into double glazed units. The Insulating Glass lines assemble the individual panes with the spacer bar and sealant to produce sealed units of the exact specification and size to meet individual requirements. 

Fabrication

Our computer controlled optimised machining centres automatically cut and route the PVCu sections ready for reinforcing if required. Each section is then welded into a frame and the weld sprue is removed utilising robotic handling devices. Each frame is individually identified by a barcode.

The frames and glazing are assembled together with the hardware, and then glazed. All glazing is packed into position with special retained packers which ensures that the finished product is set-up ready for installation.
Each unit is then quality checked, and wrapped if required. The whole process is co-ordinated to ensure that products are ready for delivery to meet the required installation date.

Installation

Installation is undertaken by trained and experienced personnel in accordance with the Anglian Installation Manual. All Installers wear uniforms and drive liveried vans.

Recycling

Anglian utilise Site Waste Management Plans to minimise site waste and maximise the re-use of waste materials. All projects with first generation PVC-u windows are fully recycled and our profiles are designed to utilise recycled materials. Click here to find out more.

After Sales

Whilst we aim to deliver ‘Zero Defects’ on all projects we undertake, we have highly efficient After Sales service departments to support our customers’ offering specialist window and door maintenance services.